User Guideline: Products Technical information-Introduction devices (C)

Basically, they are two introduction devices installation configurations for domestic wastewater treatment plants:

  1. On Bridge installation
  2. Wall Attached installation (suitable mainly to spherical shape wastewater treatment plants)

For downloading introduction devices draws, please click here: www.bio-castle.com/dlid

 

Sample of On Bridge installation:

Left- DWWTP illustration presents the implementation sites of the introduction devices (cranes) on the bridge and above the bioreactor (Red dots).

Middle- Illustration of on bridge introduction device. The introduction devices are allowing to lift the preforated cage and rotate the cage to allowing shift position for safe and confortable handeling.

Right - SBP capsules introduction devices encase the perforated cages above water surface during the operational activity (Once a month). Each introduction device encases a perforated PVC or Polypropylene or Stainless steel cage (60*60*30 cm in size, 0.8 cm pores) for SBP capsules implementation 1 meter below water surface.
Introduction devices installation pictures:

 

Sample of Wall Attached installation:

 

Introdution devices attached to the bioreactor wall.

Upper: A picture of two SBP capsules introduction devices attached to the sanitary wastewater treatment plant bioreactor.

Bottom: Illustarations of bioreactors wall attached SBP capsules introduction devices. Please note that one introduction device is a longer than the other. The introduction devices are allowing to lift the preforated cage and rotate the cage to allowing shift position for safe and confortable handeling.

 

For downloading introduction devices draws, please click here: www.bio-castle.com/dlid